Plumbing That Keeps Pace With Your Build

New construction plumbing isn't just about running pipe — it's about coordinating with your framing crew, your HVAC team, and your inspector so nothing gets in the way of your timeline.

The experience behind Quality Value Plumbing spans hundreds of residential units and multiple phases of construction — from underground and rough-in through fixture installation, testing, inspections, coordination, and project completion.

"The best time to call your plumber is before the slab is poured."

Quality Value Plumbing LLC · Based near Munfordville, KY · Serving South-Central Kentucky

Our Process

From Plans to Final Trim

Step 01

Planning & Underground

I review the plans, coordinate fixture and equipment locations, and prepare the plumbing layout before work begins. Where applicable, underground drainage, building sewer, water service, and under-slab piping are installed before the slab or floor system closes the work in.

Step 02

Rough-In

Once the structure is ready, I install the concealed plumbing — water lines, drain and vent piping, shower and tub valves, fixture connections, and other rough plumbing that must be in place before the walls are closed. Coordination with the general contractor and other trades helps keep the plumbing aligned with the project schedule.

Step 03

Testing, Inspection & Coordination

The plumbing is tested and prepared for required inspections before it is concealed. I stay in communication with the general contractor and coordinate necessary adjustments as the project moves forward.

Step 04

Final Trim, Testing & Approval

After walls, cabinets, and finished surfaces are ready, I return to set and connect the fixtures and equipment included in the plumbing scope — toilets, faucets, sinks, water heaters, disposals, fixture trim, and appliance plumbing connections where included. The system is tested, final plumbing requirements are completed, and the project is prepared for final approval.

Warranty

Workmanship After Completion

Quality Value Plumbing stands behind its new-construction workmanship. Written workmanship warranty terms are provided with the project, while applicable manufacturer warranties remain with the fixtures, equipment, and materials they cover.

What's Included

Full-Scope New Construction Plumbing

Water Supply Rough-In

Hot and cold supply lines run to every fixture location, sized correctly for your home's demand.

DWV System

Drain, waste, and vent piping installed to code — properly sloped, vented, and ready for inspection.

Water Heater Installation

Tank or tankless — the water heater is sized, installed, and connected as part of the new construction plumbing scope.

Fixture Trim-Out

Faucets, toilets, showers, tubs, and appliance connections — all set and tested at final walkthrough.

Outdoor Hose Bibs

Frost-free hose bibs installed at standard locations, or wherever your builder specifies.

Gas Line Rough-In

Natural gas or propane lines for ranges, dryers, fireplaces, and generators — run and pressure-tested.