Your Vision,Plumbed Right.

Kitchen upgrades, bathroom renovations, and whole-home remodels — I handle the plumbing and coordinate with the other trades to help keep the project moving.

Why It Matters

Remodel Plumbing Done Without the Drama

Remodel plumbing often involves hidden piping, unexpected layouts, and code considerations. Decades of hands-on experience help identify practical solutions while keeping the plumbing coordinated with the larger project.

I coordinate directly with your general contractor, tile setter, and cabinet installer so the plumbing work stays aligned with the construction schedule. Rough-in is completed before walls and finishes close the work in, helping reduce delays, rework, and inspection issues.

"Quality Value Plumbing gets in before the walls close — so nothing has to be undone later."

Quality Value Plumbing LLC · Based near Munfordville, KY · Serving South-Central Kentucky

What We Handle

Full Remodel Plumbing Services

Bathroom Remodels

New shower pans, tub surrounds, vanity rough-ins, toilet relocations — I handle the plumbing for the fixtures included in your bathroom renovation.

Kitchen Remodels

Sink relocations, dishwasher connections, pot-filler rough-ins, garbage disposal installs — your kitchen remodel, plumbed to spec.

Fixture Upgrades

Swapping out dated fixtures for something modern? I remove the old fixture and install the new one with attention to proper connections and a clean finish.

Pipe Rerouting

When your remodel moves walls or changes layouts, I reroute supply and drain lines to match the new plan.

Code Updates

Older homes often need plumbing brought up to current code during a remodel. Necessary plumbing updates can be addressed as part of the remodel and prepared for required inspection.

Laundry Room Plumbing

Adding or relocating a laundry room? I rough-in the supply lines, drain, and standpipe to fit the layout and applicable plumbing requirements.

How We Work

Coordinated, Clean, On Time

01

Review the Plans

Before work begins, I review the design plans and discuss the plumbing scope with the homeowner and general contractor. Potential plumbing concerns can then be addressed early.

02

Rough-In First

Plumbing rough-in is completed before drywall and tile wherever the project sequence allows, reducing the likelihood of unnecessary work on finished surfaces later.

03

Final Trim

Once the finishes are in place, I return to set fixtures, make final connections, and test the completed plumbing work.

Get in Touch

Planning a Remodel?

Call early to discuss the project. More lead time allows plumbing work to be coordinated with the remodel schedule.